Help Center & Documentation v1.0.2

Project Tracker User Manual

Complete step-by-step guide to tracking engineering disciplines, building Proposed Gantt Schedules, comparing Actual execution timelines, and managing role-based user access.

← Back to Dashboard
Projects Dashboard
Create projects, monitor KPIs, switch active projects, and review recent updates.
Disciplines & Sub-items
Update completeness percentages, manage checkpoints, and add custom disciplines.
Gantt Studio & Comparison
Build proposed timelines, drag schedule bars, and compare Proposed vs. Actual delivery.
Admin Console
Manage users, reset passwords, audit security logs, rotate API keys, and site settings.
01

Getting Started & Workspace Navigation

Signing in, understanding roles, and navigating with the persistent sidebar.

All Users /login.html

Project Tracker uses role-based access control (RBAC) so engineers and project managers can update field progress while administrators govern accounts, API keys, and system settings.

Role Landing Page Permissions & Capabilities
Regular User user_index.html Create, rename, and update projects; manage discipline sub-items & custom sections; build and export Gantt schedules; inspect Completed Projects, Timeline Comparison, and Activity Logs; change own password.
Administrator admin_dashboard.html Includes all Regular User features plus full User Account CRUD, Password Resets, Soft/Permanent Delete & Restore, Security Audit Logs, Scoped & Master API Key Management, and Public Homepage visibility toggle.

Persistent Collapsible Sidebar

Use the chevron toggle at the top of the left sidebar to collapse it into a compact icon rail (with hover tooltips). On tablets and mobile screens, tap the top-left menu button to open the slide-over navigation drawer.

Live Gear Sync Indicator

The subtle interlocking gear emblem in the sidebar header and footer gently rotates while operational and accelerates with a top shimmer bar whenever data is syncing with the backend server.

02

Using the Projects Dashboard

Your central command view for active projects, KPIs, and discipline progress.

All Users /user_index.html
  1. 1
    Read the Executive KPI Strip: At the top of the dashboard, four real-time stat cards summarize Overall Completion (radial ring), Active Disciplines, Tracked Checkpoints (completed vs. total sub-items), and your overall Project Portfolio.
  2. 2
    Create a New Project: Click + New Project in the top-right header, enter a project name, optionally click Choose Included Sections to select which disciplines apply, then click Create Project.
  3. 3
    Switch, Search & Filter Projects: Use the Active Project dropdown, Search Portfolio box, and Status Filter bar to locate any project. Click the pencil icon beside the project title to rename it inline, or change its status via the top-right Status dropdown.
  4. 4
    Filter Disciplines & Review Recent Activity: Use the status filter chips (All, On Track, In Progress, Needs Attention) above the discipline cards, and check the right-hand Recent Activity feed (toggleable between This Project and All Projects) for live team updates.
Auto-Completion Rule: When every enabled discipline in a project reaches 100%, Project Tracker automatically marks the project as Completed and archives it under Completed Projects.
03

Managing Disciplines & Sub-Items

Tracking granular task completeness across engineering trades.

All Users Disciplines →

Click Manage Sub-items → on any dashboard discipline card — or expand the Disciplines group in the sidebar — to open that trade's dedicated sub-item manager (Electrical, Architectural, Mechanical, Plumbing, Electronics, General, Others, or any Custom Section).

Updating Progress Percentages

Enter a value between 0 and 100 on any tracked sub-item and save. The discipline's overall percentage automatically averages all tracked sub-items, and an entry is written to Activity Logs.

Tracked vs. Untracked Items

Toggle an item between tracked and untracked to exclude non-applicable template items from a project's percentage calculation without permanently deleting them from your template.

Adding New Sub-Items

Click + Add Sub-item, provide a unique lowercase ID (no spaces), title, and optional notes. New sub-items immediately appear in the discipline and are available to Gantt Studio.

Deleting Sub-Items

Click − Delete Sub-item to remove obsolete checklist items from the discipline template.

04

Custom Sections

Extending Project Tracker with your own departments or specialty trades.

  1. 1
    Create a Custom Section: Open Custom Sections from the sidebar, enter a Section Name (e.g., Purchasing Department or Civil Works), Lead Team, Scope, Summary, and starter sub-items.
  2. 2
    Enable on Projects: Custom sections are automatically assigned a distinct theme color and appear in the Dashboard Sections picker, Sidebar Disciplines list, Gantt Studio, and Timeline Comparison.
  3. 3
    Protected Deletion: Removing a custom section requires entering valid Administrator credentials to prevent accidental data loss across projects.
05

Interactive Gantt Studio (Proposed Schedules)

Planning project baselines with a 4-step interactive scheduling wizard.

  1. 1
    Step 1 — Select Project: Pick an active or completed project, enter a descriptive Schedule Name (e.g., Phase 1 Baseline), or load/edit an existing saved schedule from the Saved Schedules list.
  2. 2
    Step 2 — Set Timeline: Use quick duration presets or the dual-handle date range slider to set the overall window, then fine-tune individual sub-item Start/End dates, priorities, assignees, dependencies, and notes.
  3. 3
    Step 3 — Preview & Drag Chart: Visually inspect every discipline's schedule bars, drag bars horizontally to shift dates in real time, and click Save Schedule to store the Proposed Baseline in the database.
  4. 4
    Step 4 — Work Distribution & Print/PDF: Review team workload percentages, total days consumed, parallel work streams, and export a clean A4 landscape report via Print / Export PDF.
06

Proposed vs. Actual Timeline Comparison

Auditing planned baseline dates against actual site execution for completed projects.

All Users /gantt_chart.html

Open Timeline Viewer in the sidebar to compare any completed project's saved Proposed Gantt Schedule against its Actual Gantt Chart built from site update logs.

Overlay Compare Mode

Stacks the hatched Proposed Baseline bar directly above the solid discipline-colored Actual Execution bar on a single shared calendar axis, with an inline variance pill (Ahead, On Time, or +Xd Late).

Side-by-Side Split Mode

Displays the Proposed Gantt Chart on the left and Actual Gantt Chart on the right with synchronized horizontal scrolling and a Shared timeline scale toggle.

Schedule Adherence KPIs

Automatically computes Proposed Duration, Actual Execution Days, Net Finish Variance, and the percentage of matched sub-items delivered on or before planned end dates.

Sub-item Breakdown & Print

Filter the bottom breakdown table by Delayed, On Time / Ahead, or Baseline / Actual Only, or click Print Comparison for an executive landscape comparison report.

07

Completed Projects & Actual Gantt Viewer

Reviewing finalized projects, inspecting Actual timelines, or reopening projects.

  1. 1
    Inspect Actual Gantt Chart In-Page: Click View Gantt Chart on any completed project card to open the in-page Actual Gantt Chart modal showing its actual execution dates, days consumed, tracked sub-item bars, and a dedicated Print Chart button.
  2. 2
    Filter Archive: Search completed projects by name or filter between 100% Verified Complete and Marked Complete (<100%).
  3. 3
    Reopen a Project: Change a project's status dropdown to In Progress, On Hold, or Not Started and confirm in the dialog. You can optionally make it your active dashboard project or reset section progress to 0%.
08

Activity Logs, Manage Projects & Public Overview

Auditing field updates, removing obsolete projects, and sharing read-only status.

Activity Logs

Every sub-item update, project creation, and status transition is logged with timestamp, user name, project, and optional browser geolocation coordinates. Filter by timeframe (All time, Past 7 days, Past 30 days) or My updates only.

Manage / Delete Projects

Open Manage Projects (/delete_project.html) to permanently remove projects you no longer need from the workspace.

Public Overview

/index.html provides a clean read-only progress showcase for stakeholders. Visitors who are not signed in cannot modify progress; clicking edit actions prompts them to sign in.

Self-Service Password Change

Click Password in the bottom-left sidebar footer at any time to update your own account password securely.

09

Administrator Console

Complete governance over user accounts, projects, security audits, API keys, and site settings.

Admin Tab Key Operations
User Management Click + Create New User to add Regular or Admin accounts (usernames accept 3–50 chars including letters, numbers, spaces, _, ., -, @; passwords require at least 6 characters or click Generate). Edit roles/status, reset user passwords (automatically invalidates active sessions), soft-delete & restore, or permanently delete accounts.
Project Management Search all projects across every status, inline-update project status, edit titles/descriptions/enabled disciplines, launch Gantt Studio directly, or delete projects.
Security & Audit Logs Inspect a chronological trail of logins, logouts, user changes, password resets, project edits, Gantt schedule saves, API key actions, and site setting changes.
API Keys Generate scoped, revocable API keys (Full access or Read-only) with expiration periods and ready-to-copy PowerShell/curl snippets, or rotate the master .env key with administrator verification.
Site Settings Toggle Public Homepage Visibility on or off. When hidden, unauthenticated visitors to / or /index.html are directed to the Sign-In Required screen.
Security Best Practice: After initial deployment, immediately sign in as admin and change the default password via the sidebar Password button. When generating API keys, store the secret immediately — full keys are shown once only.
10

Frequently Asked Questions & Troubleshooting

Quick answers to common questions across the workspace.

All Users
Why does Timeline Comparison say "No Proposed Gantt Schedule saved for this project"?
A Proposed Baseline is created in Gantt Studio (/gantt_chart_creator.html). Click + Create Proposed Schedule in the notice banner, set planned dates for your sub-items, and save the schedule. Timeline Comparison will immediately plot both Proposed and Actual timelines side-by-side and compute variance.
What is the difference between "View Gantt Chart" on Completed Projects vs. "Timeline Viewer" in the sidebar?
Clicking View Gantt Chart on Completed Projects opens a fast, in-page modal showing only the Actual Gantt Chart for that project. Opening Timeline Viewer (/gantt_chart.html) from the sidebar provides the full Proposed vs. Actual Comparison workspace with Overlay, Side-by-Side, variance KPIs, and breakdown tables.
Why did my project disappear from the Active Projects Dashboard?
Projects marked Completed (either manually via the status selector or automatically when all enabled disciplines reach 100%) move to Completed Projects so your active dashboard stays uncluttered. You can view or reopen them any time from /completed_project.html.
How do I get the cleanest Print or PDF export of a Gantt chart?
Use the built-in Print Chart / Print Comparison button on the page. All navigation sidebars, toolbars, and overlays are automatically hidden in print mode, and charts format cleanly in A4 landscape. Enable Background graphics in your browser's print dialog so discipline bar colors appear in the PDF.
How do I recover if a user forgets their password?
An Administrator can open Admin Console → User Management, click Reset Password on that account, generate or enter a new password (min. 6 characters), and confirm. All previous sessions for that user are signed out automatically.